Saudi Arabia is reportedly scaling back its 100-mile desert megacity after rising cost concerns

On: Friday, February 6, 2026 6:20 AM

Saudi Arabia is reportedly scaling back its 100-mile desert megacity after rising cost concerns

Saudi Arabia’s ambitious plans to build a futuristic 100-mile-long desert megacity called **The Line**, part of its $500 billion NEOM project, are reportedly being scaled back. Once a key centerpiece of the country’s Vision 2030 economic reform program, the ambitious linear city designed to house nine million people and stretch across the desert from the Red Sea inland is now facing a reality check. Mounting construction costs, shifting global economic conditions, and engineering hurdles have forced stakeholders to rethink the project’s initial timelines and scope.

Originally envisioned as the world’s most advanced smart city — powered by AI, fully sustainable and car-free — the scaled version reportedly targets the completion of **2.4 kilometers** of urban development by 2030, a fraction of the intended 170 kilometers. This retrenchment marks a dramatic downsizing that may reshape the global perception of not only NEOM but also Saudi Arabia’s sprawling transformation blueprint.

Key points about The Line project downsizing

Original Project Scale 170 kilometers long, 9 million residents
Revised Scope by 2030 2.4 kilometers, around 300,000 residents
Estimated Investment $500 billion (entire NEOM project)
Key Motivation Diversify economy, reduce oil dependence
Main Challenges High construction cost, technical complexity
Expected Completion (1st Phase) By 2030

Why Saudi Arabia launched The Line

The Line was launched by Saudi Crown Prince Mohammed bin Salman in 2021 as part of Vision 2030, a sweeping strategy to diversify the kingdom’s economy away from its dependence on oil. The megacity promised a reimagined way of urban living — clean, vertical, community-centered, and driven by **green technology**. It would reportedly have zero cars, zero streets, and run on 100% renewable energy.

Designed as a series of connected city modules housed between two mirrored walls stretching over 100 miles, the city was intended to revolutionize everything from **urban mobility** to infrastructure design. It promised facilities such as schools, clinics, and shops within five-minute walks, with high-speed transit options covering the full length in just 20 minutes.

What changed this year

The latest reports suggest the kingdom has dramatically curtailed the size and delivery timeline for The Line. Instead of stretching across the desert in one monumental push, only a small portion — just 2.4 km — is now expected to be completed by the 2030 benchmark. That’s less than 2% of the originally envisioned length.

The decision is believed to be driven by a combination of factors: rising **construction costs**, global economic disruptions, and internal reassessments about feasibility and utility. Building a linear city in a remote and arid landscape comes with **unprecedented engineering and infrastructure challenges** that are both time-consuming and expensive.

“Scaling back The Line doesn’t mean the dream is over. It’s about realism and adapting to what’s practically achievable.”
— Ali Alhamdan, Urban Development Analyst

Economic factors behind the slowdown

Global inflation, labor shortages, and steel price hikes have impacted large-scale infrastructure projects across the globe — and NEOM is no exception. The design of The Line, with its vertical city stacked within mirrored walls, demands **cutting-edge construction materials and logistics** that are both labor-intensive and capital-heavy.

Saudi Arabia has already invested billions into project preparation, including initial construction, hiring thousands of workers, and acquiring advanced building technologies. However, continuing at full scale would require massive annual outlays that might strain even the kingdom’s deep pockets, especially with other giga-projects competing for funding under Vision 2030.

“It’s a signal to investors that the kingdom is willing to adjust its ambitions based on pragmatic cost-benefit analyses.”
— Sarah Fatani, GCC Infrastructure Consultant

Who wins and who loses from the scale-back

Winners Losers
Local contractors with short-term projects Global construction firms banking on full-scale build
Saudi treasury (reduced fiscal pressure) Early-stage employees hired for long-term vision
Environmental advocates wary of large desert encroachment Vendors and suppliers aligned with original mega-scope

What this means for Vision 2030

The Line has been among the highest-profile ventures within **Vision 2030**, symbolizing Saudi Arabia’s ambition to become a hub of innovation and sustainability. The implications of slowing it down could ripple across other components of NEOM and broader attempts to attract international investors.

However, analysts suggest that this strategic retreat may lend **credibility and professionalism** to the program. By adjusting scope transparently, Saudi Arabia acknowledges on-the-ground challenges and sends a signal that it favors delivery over dazzling hype.

Focus shifts to NEOM’s other projects

NEOM is not just The Line. The futuristic development zone also includes projects like Oxagon (a floating industrial city), Trojena (a year-round mountain resort), and Sindalah (a luxury Red Sea island getaway). With The Line scaled back, **more attention and funding could now shift to these alternative NEOM zones**, some of which have shorter construction timelines and clearer return-on-investment models.

For example, Trojena is aiming to host the Winter Asian Games in 2029, giving it a hard deadline. Similarly, Sindalah is already progressing well, bolstered by interest from international tourism investors. By redistributing focus, NEOM may still emerge as a flagship development — just not in the original format.

What to expect by 2030 and beyond

Despite the adjustments, the initial phase of The Line is still expected to create a **high-density, AI-supported urban enclave** that showcases renewable energy, smart infrastructure, and world-class connectivity. If successful, this 2.4-kilometer stretch could become a powerful case study of how cities of the future can be planned and built — albeit on **a more measured path**.

Saudi officials are expected to monitor the pilot phase closely, using it as a basis for future expansion. The architectural vision and branding of The Line remain intact, though **timeline realism and budget optimization** are now the guiding principles.

“It’s no longer about building the largest possible structure. It’s about demonstrating proof of concept and securing long-term sustainability.”
— Dr. Huda Nassif, Urban Futurist and Consultant

Short FAQs about The Line and NEOM

What is The Line project in Saudi Arabia?

The Line is a planned futuristic linear city within Saudi Arabia’s NEOM region, designed to run for 170 kilometers with zero cars, carbon emissions, and full AI integration.

Why is The Line being scaled back?

The city is being trimmed due to escalating construction costs, global economic changes, and logistical challenges in building such a vast and unconventional city in an arid environment.

What is the new target for completion?

The revised plan aims to build 2.4 kilometers of The Line by 2030, housing up to 300,000 residents — a major reduction from the original goal of 9 million residents.

Will The Line still be part of Vision 2030?

Yes, The Line remains part of Vision 2030, though it will be progressed in smaller, more practical phases rather than the full-length city initially envisioned.

How much has Saudi Arabia invested in NEOM?

The overall NEOM project is backed by a $500 billion investment, though exact allocation to The Line varies and may change with revised plans.

Are other NEOM projects affected?

Other sub-projects like Oxagon and Trojena remain on track and may even gain more attention and investment focus in light of the shift in priorities.

Will international investors still support NEOM?

Adjusting the project’s scale may instill greater investor confidence by showing adaptability and financial discipline, rather than overambitious planning.

Will residents live in The Line by 2030?

If the revised plan holds, early residents may live in the built sections of The Line by 2030, showcasing a pilot version of Saudi Arabia’s smart city vision.

Join WhatsApp

Join Now

Join Telegram

Join Now

Leave a Comment